
Ordering the right amount of concrete is critical for any project—whether it’s a patio, driveway repair, shed foundation, or walkway. Over-ordering leads to waste and extra costs, while under-ordering can cause frustrating delays. That’s why short load concrete delivery is the perfect solution for Wallingford homeowners and contractors looking for precise, cost-effective concrete delivery.
In this guide, we’ll cover the cost of wasted concrete, how to measure your project correctly, and how A-Plus Concrete ensures you get the exact amount you need.
The Cost of Wasted Concrete
Over-ordering concrete might seem harmless, but it can lead to unexpected expenses and project inefficiencies. Here’s why you should avoid ordering more than necessary:
1. Unnecessary Costs
- Concrete is priced by volume, so every extra cubic yard you order is money wasted.
- Many suppliers charge disposal fees for excess concrete, increasing costs even more.
2. Disposal Challenges
- Unused concrete hardens quickly, making it difficult to get rid of.
- Improper disposal can be costly and may require special removal services.
3. Environmental Impact
- Excess concrete often ends up in landfills, contributing to waste.
- Ordering only what you need reduces your project’s environmental footprint.
By accurately calculating your concrete needs, you can avoid unnecessary costs, eliminate waste, and streamline your project.
How to Measure Your Project Correctly
Ordering the right amount of concrete starts with accurate measurements. Follow these simple steps to ensure you get the perfect amount:
1. Measure Your Project Area
- Use a tape measure to find the length, width, and depth of the area.
- Ensure all measurements are in feet and inches for consistency.
2. Calculate the Volume
Multiply the length × width × depth to get the total volume in cubic feet.
- Example: A patio that’s 10 feet long, 5 feet wide, and 0.5 feet deep:
- 10×5×0.5=2510 \times 5 \times 0.5 = 2510×5×0.5=25 cubic feet.
3. Convert to Cubic Yards
Since concrete is sold in cubic yards, divide the total cubic feet by 27.
- Using the patio example: 25÷27=0.9325 \div 27 = 0.9325÷27=0.93 cubic yards.
4. Add a 10% Buffer
To account for variations in depth or slight miscalculations, add 10% extra.
- Final order: Approximately 1 cubic yard.
5. Consult A-Plus Concrete for Expert Advice
Not sure if your calculations are correct? Our team will help you determine the perfect amount, so you don’t over-order or run short.
A-Plus Concrete’s Smart Delivery System
At A-Plus Concrete, we specialize in short load deliveries, ensuring you get the exact amount of concrete needed—nothing more, nothing less. Here’s how we help:
✔ Flexible Small Load Options
- No large minimum orders—order just what your project requires.
- Perfect for residential projects, repairs, and smaller commercial jobs.
✔ Professionally Mixed Concrete
- Our ready-mixed concrete guarantees consistent strength and durability.
- No need to worry about uneven mixes or low-quality results.
✔ Reliable, On-Time Delivery
- Your concrete arrives fresh and ready to pour.
- Avoid delays and wasted time with scheduled, dependable service.
✔ Expert Guidance for Accurate Ordering
- Need help with calculations? Our team ensures you get the right amount.
- We work with homeowners and contractors to prevent over-ordering and waste.
Get the Right Amount of Concrete with A-Plus Concrete in Wallingford
Avoiding wasted concrete is easy when you measure accurately and work with a reliable short load delivery service like A-Plus Concrete. We ensure that your project stays on budget, on schedule, and free from excess material.
✔ Cost-effective small load concrete
✔ No high minimum orders—order only what you need
✔ On-time delivery for fresh, high-quality concrete
✔ Expert advice to help you measure and calculate correctly
Ready to place your order?
Contact A-Plus Concrete today to schedule your short load delivery in Wallingford and get the perfect amount of concrete for your next project! 🚚🏗💪